Valuation method
Fire safety in high-rise buildings (IGH) - Technical Instruction on heat load assessment

Add to my library

TBA3056 V1 Article

Valuation method
Fire safety in high-rise buildings (IGH) - Technical Instruction on heat load assessment

Authors :

Review date: April 29, 2021 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

6. Valuation method

For furniture and fittings, the assessment concerns the heat load of the container and contents.

It may be permissible to estimate the heat load of the contents at maximum load, particularly when visual inspection is not possible.

6.1 Calculation of heat load

  • 1 re step: the heat load of each item of furniture is determined by one or more of the following methods:

    • according to the predefined references (table 1 and table 2 );

    • on the basis of supporting documents...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Preparing for construction"

( 121 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us