Read this article from a comprehensive knowledge base, updated and supplemented with articles reviewed by scientific committees.
Read the article
Implemented in the wake of the September 11, 2001 attack on the World Trade Center, these regulations cover fire safety, accessibility and evacuation in high-rise buildings (IGH) and very-high-rise buildings (ITGH), based on fire safety regulations for public buildings (ERP).
The order is divided into several titles and sections. This article presents the provisions of articles GH1 to GH5, covering :
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Fire safety in high-rise buildings (IGH) - General measures
Bibliography
Also in our database
-
Sécurité incendie des ERP – Dispositions concernant la construction. - [TBA 3 002]...
Codes
Article R. 122-4 of the French Construction and Housing Code, amended by Decree no. 2006-665 of June 7, 2006.
Article R. 122-2 of the French Construction and Housing Code, amended by Decree no. 2009-1119 of September 16, 2009.
Article R. 4216-1 of the French Labor Code.
Article R. 123-29 of the French Construction and Housing Code.
Article R. 111-1-1 of the French Construction and Housing Code.
Article R....
Regulations
Décret n° 2006-665 du 7 juin 2006 relatif à la réduction du nombre et à la simplification de la composition de diverses commissions administratives (NOR : ECOJ0600006D).
Decree no. 2008-244 of March 7, 2008 on the Labor Code (regulatory part). The regulatory part of the Labor Code is the subject of a special publication appended to today's Journal officiel (NOR : MTST0804938D).
Décret n° 2009-1119 du 16 septembre 2009...
Standards
- Exigences générales relatives aux organismes procédant à la certification de produits - NF EN 45011 (ISO/IEC 65) - 1996
- Exigences générales concernant la compétence des laboratoires d'étalonnages et d'essais - NF EN ISO/CEI 17025 - 2005
Data on technical inspection reports
1. Post-work regulatory inspection report (RVRAT)
The RVRAT consists of at least two parts:
1.1 General and administrative information to be included at the beginning of the...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!