4. Risk management
Local authorities are responsible for taking risk into account in urban planning documents. The State, for its part, is responsible for drawing up natural risk prevention plans (PPR) for the communes most at risk [TBA 250].
However, riparian owners of non-domestic watercourses also have an essential role to play: they are obliged :
regular cleaning of the bed, to restore the watercourse to its natural width and depth;
maintain the banks belonging to them;
remove logjams and debris to maintain the natural flow of...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Risk management
Bibliography
-
(1) - MINISTÈRE EN CHARGE DE L'URBANISME, FÉDÉRATION NATIONALE DES SCOT - Le SCoT modernisé - (2022).
-
(2) - CENTRE SCIENTIFIQUE ET TECHNIQUE DU BÂTIMENT - Inondations : guide d'évaluation de la vulnérabilité des bâtiments vis-à-vis de l'inondation - (2005).
-
(3)...
Also in our database
-
Prévention des risques naturels majeurs - [TBA 250]...
Directory
Organisme professionnel de prévention du bâtiment et des travaux publics – OPPBTP http://www.oppbt.fr
French Building Federation – FFB https://www.ffbatiment.fr
Fédération nationale des travaux publics – FNTP https://www.fntp.fr
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!