2. Players and missions
SCROLL TO TOP
2.1.1 Presentation
This is the person who commissions the work, or for whom it is built. He is the person principally responsible for the work, and in this role fulfills a function of general interest from which he cannot withdraw.
The project owner is obliged to incorporate occupational risk prevention into his project even before work begins, and to monitor it at every stage.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Players and missions
Standards and norms
- Scales – Part 1: terminology, types, functional dimensions [cancelled October 25, 2019] - NF EN 131-1 - Décembre 2015
- Escabeaux - NF EN 14183 - Juin 2004
- High-visibility clothing – Test methods and requirements – High-visibility warning clothing - NF EN ISO 20471 - Juin 2013
- Casques de protection pour l'industrie - NF EN 397+A1 - Février 2013
- Mountaineering and climbing equipment – Mountaineering...
Regulations
Guidelines
Council Directive 89/391/EEC of June 12, 1989 on the introduction of measures to encourage improvements in the safety and health of workers at work
Council Directive 89/654/EEC concerning the minimum safety and health requirements for the workplace
Council Directive 89/655/EEC concerning the minimum safety and health requirements for the use of work equipment by workers at work
Council Directive...
Directory
Legifrance
https://journal-officiel.legifrance.gouv.fr/
Guide to compulsory and recommended construction training courses
http://www.formations-obligatoires-btp.fr/
CNFPT
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!