3. Bridge pavements
A joint is required on a bridge, viaduct or footbridge whenever there is a possibility of relative movement between two structural elements of the structure and when the area of movement affects the roadway carrying traffic [6].
For joint performance, a distinction must be made between :
The "blow" (or sometimes "clearance") of a joint is the maximum foreseeable relative displacement of the two facing elements, measured between their two extreme positions (and not in relation to the mean or...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Bridge pavements