5. Geotechnical investigations
In order to assess the geotechnical site conditions and geological risks, and to define the characteristic values of the geotechnical design parameters, a geotechnical investigation program at the site of each wind turbine in a wind farm is a prerequisite for the pre-project (G2-AVP) and then project (G2-PRO) geotechnical design missions, as defined in standard NF P 94 500 of November 2013.
-
The definition of the geotechnical investigation campaign is based on prior bibliographical knowledge of the site:
BRGM 1:50,000 geological map;
BRGM hydrogeological map;
public mapping (clay/cavity/water table rise, seismicity, etc.);
boreholes available locally in the BSS subsoil database, maintained by BRGM.
In areas where wind farm development is likely to be significant, geotechnical...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Geotechnical investigations