8. Geotechnical risk management
Standard NF P 94 500 of November 2013 defines the general framework for the sequence of geotechnical engineering assignments to be carried out as part of the construction of a structure.
These missions are organized in 3 successive stages:
preliminary studies ;
design studies ;
completion of the work.
Geotechnical engineering assignments are generally undertaken after the building permit has been obtained. See table 6
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Geotechnical risk management
Bibliography
-
(1) - CFMS, Groupe de travail « Fondations d'éoliennes » - Recommandations sur la conception, le calcul, l'exécution et le contrôle des fondations d'éoliennes, - 5 juillet 2011.
-
(2) - Projet national ASIRI - Recommandations pour la conception, le dimensionnement, l'exécution...