8. Geotechnical risk management
Standard NF P 94 500 of November 2013 defines the general framework for the sequence of geotechnical engineering assignments to be carried out as part of the construction of a structure.
These missions are organized in 3 successive stages:
preliminary studies ;
design studies ;
completion of the work.
Geotechnical engineering assignments are generally undertaken after the building permit has been obtained. See table
6
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Geotechnical risk management