5. Conclusion
Lightning protection means taking into account all the devices involved, from the catching device to its furthest extremities, such as earthing systems or equipotential bonding bars. As far as possible, when designing the installation, it is important to consider the location of down conductors, natural or otherwise, as well as earthing systems and their interconnections, both with each other and with the electrical or telecommunications network. This is why it's better to speak of a lightning protection system, which is more general than the usual term "lightning conductor".
To determine the SPF's level of protection, which characterizes its effectiveness, the method used is Lightning Risk Analysis. The output of a LRA is a level of protection for the structure under study, and also a level of protection for the arresters installed on the lines connected to the structure. This protection...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Conclusion
Bibliography
-
(1) - PEDEBOY (S.) - Review of the lightning dataset and lightning locating system performances as recommended by the IEC 62858 standard - CIGRE ICLPS (2019).
-
(2) - SCHMITT (S.), ROUSSEAU (A.) - Thunderstorm warning systems : IEC 62793 standard – - ICLP (2016).
-
(3)...
Also in our database
-
ROUSSEAU (A.) - Foudre et protection des bâtiments – La physique, - [C 3 307]...
Standards and norms
AFNOR
- Low-voltage arresters – Part 11: Surge arresters connected to low-voltage systems – Requirements and test methods - NF EN 61643-11/A11 - 2018
- Low-voltage surge arresters – Part 21: Surge arresters connected to signal and telecommunication networks – Operating specifications and test methods - NF EN 61643-21/A2 - 2013
- Protection contre la foudre Partie 1 : Principes généraux - NF EN 62305-1...
Regulations
ICPE Order: Arrêté du 11 mai 2015 modifiant une série d'arrêtés ministériels pour prendre en compte la nouvelle nomenclature des installations classées pour la protection de l'environnement entrant en vigueur au 1er juin 2015 dans le cadre de la transposition de la directive no 2012/18/UE du 4 juillet 2012.
Decree known as INB: Decree of 07/02/12 laying down the general rules governing basic nuclear installations.
...
Directory
Manufacturers – Suppliers – Distributors (non-exhaustive list)
Duval-Messien
https://duval-messien.fr/
nWind
https://www.nvent.com/fr/fr.html
Franklin-France
https://franklin-france.com/
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!