6. Liability and litigation
From the outset of contract negotiations, the lessor (and more specifically the contractor, architect or consulting engineer) incurs a number of responsibilities.
These are very varied, and need to be examined both during the performance of the contract (before acceptance of the work), and after acceptance of the works.
In the performance of its contract, the lessor is likely to incur various liabilities, whether contractual, quasi-delictual or even tortious.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Liability and litigation