7. Urban tunnels with authorized clearance less than (or equal to) 3.50 m
These tunnels are normally closed to TDG.
Three gauges are used: 2 m, 2.70 m and 3.50 m. Smoke extraction systems are required for tunnels longer than 300 m, and safety provisions are governed by the same rules as for other tunnels.
Here are 3 points to consider:
emergency vehicle access for tunnels with a gauge of 2 to 2.7 m, which do not allow the use of standard fire-fighting vehicles: only asphyxiated and injured rescue vehicles (VSAB) can enter tunnels with a gauge of 2.70 m. In all other cases, specific provisions concerning rescue operations and the size of their vehicles will have to be studied;
underground...