The resource allocation problem can be formulated in two different ways:
1) Let Xibe the budget allocated for the ith project, and let f *i be the performance associated with this resource allocation. We are looking for (X1*, X2*, X3*, ..., Xn*) which maximizes the total profit from the overall allocation over the projects. This definition is consistent with the approach that seeks to maximize profit, given a given limited budget.
2) Let Xn be the budget allocated for the nth project. We are looking for (X1*, X2*, X3*, ..., Xn*) that minimizes the total allocation over projects, with constraints such as time, performance, while keeping the total profit at a satisfactory level.
The latter definition focuses on cost minimization, and is...