1. Requirements acquisition phase
The first phase (figure 1), which can be called the requirements analysis (or acquisition) process, is a four-stage process (figure 2):
1. elucidation of requirements ;
2. requirements analysis (negotiation) ;
3. requirements documentation ;
4. verification.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Requirements acquisition phase
Bibliography
-
(1) - The Standish Group - The chaos report. - Technical report (1994).
-
(2) - HULL (E.), JACKSON (K.), DICK (J.) - Requirements Engineering. - Springer, Berlin (2005).
-
(3) - BOULANGER (J.L.) - . – Expression et validation des propriétés de sécurité logique...
Also in our database
-
CHAPAS (P.) - Composantes et applications électriques du système ferroviaire. - [D 5 510].
...
Events
ERTSS Embedded Real Time Software and System
http://www.erts2012.org/
ESREL
http://www.esrel2011.com/
LambdaMU
http://www.imdr.fr
Qualita
Standards and norms
- CENELEC, Applications ferroviaires. Spécification et démonstration de la fiabilité, de la disponibilité, de la maintenabilité et de la sécurité (FMDS). - NF EN 50126 - janvier 2000
- ISO, Quality management systems – Requirement. - ISO 9001 :2008 - Décembre 2000
- IEC, Sécurité fonctionnelle des systèmes électriques électroniques programmables relatifs à la sécurité, norme internationale. - IEC 61508 - 2008
...
Directory
Manufacturers – Suppliers – Distributors (non-exhaustive list)
APTE
http://cabinet-apte.fr.
Organizations – Federations – Associations (non-exhaustive list)
AFIS
http://www.afis.fr
CERTIFY
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!