4. Conclusion
EMC maintenance is a delicate subject, rarely addressed in system design, because it involves operations which, if not carefully planned, quickly become cumbersome. However, there are cases where the protection of critical functions cannot do without regular performance checks. Either they are included in the maintenance cycles as part of the functional check, or in-situ checks are required. Automated active testing is possible, and can be included in low design costs if the electronics are designed with this in mind at an early stage. As always, EMC should not be seen as a constraint to be resolved at the last minute, but as an opportunity to improve the performance of electronics, including in their original mission.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Conclusion
Bibliography
Also in our database
-
LISSORGUES (G.) - Filtres actifs – Synthèse et réalisation - [E115] (2008).
- ...
Software tools
Qucs: Quite Universal Circuit Simulator, http://qucs.sourceforge.net
Standards and norms
GAM T 20: Methods for measuring attenuation of shielding and faradized enclosures
DO-160G – Environmental Conditions and test Procedures for Airborne Equipment
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!