2. Determining needs
To optimize the design of the electrical infrastructure for a construction site, it is essential to work with the future site manager or the head of the Methods department to study the projected needs of the project. This is a kind of audit, covering the points examined below.
SCROLL TO TOP
2.1.1 Receiver census
Drawing up a list of receivers (lighting, motors, heating, low-current receivers) generally poses no problems. However, it is important not to omit power supplies...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Determining needs