Article 7 of arrêté du 4 octobre 2010 stipulates that the initial status and monitoring plan must be drawn up either on the basis of a professional guide recognized by the Minister for the Environment, or on the basis of a methodology developed by the operator. In the latter case, the prefect may require a critical analysis by an external expert body chosen by the operator in agreement with the authorities.
The methodological guide for the management and control of the ageing of instrumented risk control measures (MMRI) DT 93 of July 2011 presents :
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
What reference framework can we use?
Bibliography
Also in our database
-
(1) - Évaluation du niveau de SIL des Fonctions Instrumentées de Sécurité (SIF) – Notions essentielles -
Bibliography
IDDIR (O.) – Principle for assessing the probability of failure of risk control measures [SE 4057] Safety and risk management (2009)
IDDIR (O.) – Quantifying risk in hazard studies [G 4218] Environment (2013)
Websites
UIC
In particular, you'll find the DT 93 guide (click on the "Activities" tab, then "Health, safety and environment", then "Modernization plan").