8. Our advice
Before valuing an MMR in the face of an accident scenario, it is important to check that the MMR is "efficient".
In the context of EDDs, article 4 of the PCIG decree of September 29, 2005 specifies that: "To be taken into account in the probability assessment, risk control measures must be effective, have implementation kinetics in line with those of the events to be controlled, and be tested and maintained in such a way as to guarantee the continuity of the aforementioned positioning". If this is not demonstrated in the ESD, the DREAL may decide not to include MMR in the assessment of the scenario's probability.
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Our advice
Bibliography
Also in our database
-
(1) - De la réflexion à l'élaboration : les objectifs, moyens et méthodes relatifs à l'étude de dangers (ED) -
Bibliography
Omega Report – INERIS - DRA-08-95403-01561B - Evaluation of engineered safety barriers - Ω 10 – 2008
James Reason - Human Error, Models and Management - Cambridge University Press . 1990
Website
www.ineris.fr/badoris
This site presents fact sheets describing risk control measures (RCMs) frequently encountered in industry.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!