3. Advantages and limitations of the CWA-RBIM method
The CWA-RBIM risk-based inspection and maintenance method developed
as part of a European Community initiative provides the main guiding
principles for drawing up a risk-based inspection and maintenance
program. It has been validated in the energy, chemical and petrochemical
industries for the part directly defined in the CWA document, and
extended through the RIMAP project.
The CWA-RBIM method is a risk-based inspection method based largely
on the majority of European standards relating to risk, risk management
methods, operational safety and maintenance. Its primary aim is to
provide an alternative to the risk-based inspection standards defined
by API.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Advantages and limitations of the CWA-RBIM method