1. Origins and objectives of the SRCM process developed by EPRI
Following the publication of the RCM report by Nowlan and Heap in 1978 in the aeronautical field, the Electrical Power Research Institute (EPRI), funded by American electricity producers, transposed this method to the nuclear industry as early as 1983 in pilot experiments for various nuclear power plant systems. The nuclear operators concerned found that applying the original RCM method required too much time and resources, leading them to suspend its application. EPRI then looked for alternative...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Origins and objectives of the SRCM process developed by EPRI
Bibliography
-
(1) - NOWLAN (S.), HEAP (H.) - Reliability-Centered Maintenance, - United States Department of Defense (1978).
-
(2) - EPRI - Streamlined Reliability-Centered Maintenance (SRCM) Program for Fossil-Fired Power Plants. TR-109795-V3, - EPRI, Palo Alto, CA.USA, December 1999.
-
(3)...
Also in our database
-
ZWINGELSTEIN (G.) - Méthodes de maintenance basées sur la fiabilité et sur les risques - [SE1650]...
Software tools
APT, January 2016, Preventance. Asset Performance Technologies 400 Gold Ave SW, Suite 508, Albuquerque, NM 87102, USA
Standards and originals
NF EN – Maintenance terminology, NF EN 13306, June 2010