3. RCM2™ method developed by John Moubray
As indicated in section
1
, the selection of proactive maintenance tasks qualified as technically feasible and worth doing in RCM2 is conditioned by the use of two major...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
RCM2™ method developed by John Moubray
Bibliography
-
(1) - NOWLAN (S.), HEAP (H.) -
Reliability-Centered Maintenance.
-
United States Department of Defense (1978).
-
(2) - MOUBRAY (J.) -
RCMII, Reliability-Centered.
-
Second edition 2.2 Maintenance Industrial...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!