1. Origins and objectives of the PMO2000® method
In 1978, Nowlan and Heap defined the principles of the first reliability-based maintenance (RBM) method for the aeronautical industry, known by its acronym RCM (Reliability Centered Maintenance). This method has proved its effectiveness, forming the basis of the aeronautical standard MSG3
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Origins and objectives of the PMO2000® method
Bibliography
-
(1) - NOWLAN (S.), HEAP (H.) - Reliability-centered maintenance, - United States Department of Defense (1978).
-
(2) - ATA-MGS-3 - MSG-3 : Operator/Manufacturer scheduled maintenance development, - Fixed Wing Aircraft : Revision 2015.1.ATA-MGS-3, vol. 1 (2015).
-
(3)...
Also in our database
-
ZWINGELSTEIN (G.) - Méthodes de maintenance basées sur la fiabilité et sur les risques - [SE 1 650]...
Software tools
Nexus Global Business Solutions, 2016, PMO2000®Planned Maintenance Optimization Software [Software]. Nexus Global Business Solutions, Inc. 10777 Westheimer Rd.#1100 Houston, 77042, United States.
Websites
Maintenance discussion forums
http://reliabilityweb.com
http://www.maintenance.org (pages consulted on May 10, 2016)
Standards and norms
- MSG-3: Operator/Manufacturer Scheduled Maintenance Development, Volume 1 – Fixed Wing Aircraft : Revision 2015.1 - ATA-MGS-3 - 2015
- Evaluation Criteria for Reliability-Centered Maintenance (RCM) Processes - SAE-JA1011 - 2009
- Dependability management – Part 3-11: Application guide – Reliability-based maintenance - CEI 60300-3-11 - 2009
- Terminologie de la maintenance - NF EN 13306 - 2010
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!