4. Resources: risk management
Once the concepts associated with damage and its sources have been defined, it's time to manage the risk of damage in order to guarantee the absence of unacceptable risk, i.e. safety. Figure 3 provides a schematic representation of the main stages in the risk management process.
This process corresponds to that presented in ISO 14971 [37] taken from the generic standard ISO Guide 51 [38]. Before detailing each stage of this process in paragraphs
4.3
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Resources: risk management
References
-
(1) - - 90/385/CEE. Directive du conseil du 20 juin 1990 relative aux dispositifs médicaux implantables actifs. Journal Officiel des Communautés Européennes (JOCE) N° L189 (1990).
-
(2) - - 93/42/CEE. Directive du conseil du 14 juin 1993 concernant les dispositifs médicaux. Journal Officiel des Communautés...
Manufacturer
Integrated surgical systems, which markets the Robodoc medical robot: ISS Inc, USA, http://www.robodoc.com
Organizations
Institut européen de cindyniques : http://www.cindynics.org
Institut National de Recherche et de Sécurité (INRS)http://www.inrs.fr
Occupational Safety and Health Administration (OSHA)http://www.osha.gov
Food and Drug...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!