4. Lifting stations
Where gravity flow of wastewater cannot be ensured due to the characteristics of the site, a lifting station may be required to lift raw wastewater upstream of primary treatment, pre-treated wastewater upstream of secondary treatment, or treated wastewater downstream of the ANC system for discharge. Irrespective of their location, lift stations must meet the following requirements:
specifications of the NF EN 12050 series of standards (maximum pit test deformation of 7.5%, tightness of substation, connections and access cover). The standard
NF EN 12050-1
concerns raw sewage treatment plants and the
norme NF EN 12050-2
applies to other items;
IP68-rated pump and...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Lifting stations