5. Adaptation of existing diking systems
Adapting a diking system requires the study and comparison of different options, which can be very different in terms of the principles implemented. The project must be carried out in compliance with regulatory requirements, particularly in terms of safety and the environment. It must also be economically justified.
The adaptation of diking systems must be considered on several scales:
on the scale of a river watershed or a coastal sedimentary unit;
on the scale of the diking system ;
on the scale of the structure (we'll consider a dike-type structure here).
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Adaptation of existing diking systems
Bibliography
-
(1) - PATOUILLARD (S.), MAURIN (J.) - Renforcement des digues, - symposium européen « Problèmes actuels de la protection contre les inondations », Paris – Orléans (28-29-30 mars 2012).
-
(2) - CIRIA, CETMEF, USACE - The International Levee Handbook, C731, - CIRIA, London – ISBN : 978-0-86017-731-9 (2013).
- ...
Also in our database
-
Prévention du risque inondation. - [TBA251] Construction et travaux...
Regulations
Law of September 16, 1807 on the draining of marshes
Directive 2007/60/EC of October 23, 2007 on the assessment and management of flood risks
Decree no. 2015-526 of May 12, 2015 on the rules applicable to works built or developed with a view to preventing flooding and the rules governing the safety of hydraulic structures
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!