4. Analyze the risks
Risk analysis is generally initiated by means of a preliminary risk analysis (PRA). According to the IEC-300-3-9 standard (IEC 300-3-9 "Management of operational safety", 1995), preliminary risk analysis (PRA) "is a hazard identification and frequency analysis technique that can be used in the early phases of design to identify hazards and assess their criticality".
An example of a simplified APR table can be presented as follows ( Source : INERIS (DRA-35) Ω-7 Méthode d'analyse des risques générés par une installation industrielle - octobre 2006 ) :
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Analyze the risks