What are the prerequisites for calculating earned value?
Earned value analysis

Add to my library

FIC1505 V1 Practical sheet

What are the prerequisites for calculating earned value?
Earned value analysis

Author : Stefan CSÖSZ

Publication date: July 10, 2015 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

2. What are the prerequisites for calculating earned value?

Three key cost performance measures are required for earned value analysis:

  • the actual cost of work performed at time T (CRTE) ;

  • the budgeted cost of work performed at time T (CBTE), also known as the earned value;

  • budgeted cost of planned work (CBTP).

2.1 Actual cost of work performed (CRTE)

At a given point T in the project, a set of tasks has been fully or partially completed. The actual cost of the tasks, often higher than planned, is now known. It is then possible to know the cost incurred or the Actual Cost of Work Performed (ACWP).

SCROLL...
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
What are the prerequisites for calculating earned value?

Article included in this offer

"Design and engineering management"

( 367 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us