6. What are the five stages of the linear friction-welding cycle?
Don't forget that the machine is soundproof.
All production requires the machine to be opened up first, to give the operator access.
Attention
Opening the press takes a lot of time!
While soldering time lasts between 5 and 10 seconds, supply door opening time is often of the order of 1 to 3 seconds.
The average cycle time for vibration welding is around 30 seconds.
The machine's protective door opens and feeding is possible.