4. Examine different ways of dividing up the project
There are several ways of structuring a project and dividing it into different parts, work packages...
WHAT to do: break down the product into sub-assemblies, a document known as the product breakdown structure (PBS);
the HOW to do the what: breakdown into elementary tasks, a document known as the work breakdown structure (WBS);
the WITH what resources: a breakdown of the resources used, a document known as the resource breakdown structure (RBS);
WHO is responsible: organization breakdown structure (OBS).
It is now necessary to examine in greater detail the objectives of each possible form of project division.