8. Our advice
the system (system for comparing forecasts and actuals – exceptions and tolerances);
selected indicators (content, variance and forecast indicators) :
control points (periodic control, reagent) ;
types of information required and key events (progress meetings, reviews).
SCROLL TO TOP
Provide all the information you need for the progress meeting at least ten days in advance, or as soon as the meeting is called if...