2. Speed and overall industrial performance
Physical lead-time is defined as the time elapsed between the moment the material is received and the moment the product is delivered to the customer. During this lead-time, materials can be in different states: material stock, work-in-progress, product stock (figure 4).
This lead-time determines a fundamental financial quantity for the company: the working capital requirement (Figure
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Speed and overall industrial performance
Bibliography
-
(1) - DE ROSNAY (J.) - Le Macroscope. - Seuil (1977).
-
(2) - WOMACK (J.), JONES (D.) - Système Lean : penser l'entreprise au plus juste. - Pearson (2009).
-
(3) - ROTHER (M.), SHOOK (J.) - Bien voir pour mieux gérer. - Institut Lean France (2008).
...
Also in our database
-
PATHY (F.), BILLAM (R.) - Amélioration continue dans l'entreprise. - [AG 4 100].
...
Software tools
• eVSM – Electronic Value Stream Mapping http://www.esvm.com
Standards and norms
- Quality management systems – Basic principles and vocabulary - NF EN ISO 9000 - Octobre 2005
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!