4. Simplified implementation of the approach
This process begins with the creation of meaning for the group of designers. Implicitly, the process facilitates the gradual materialization of an image of the project, with the objective of objectivity and certainty to frame the project(s) of actor(s) and technical system(s).
In the second stage, the designers explicitly update the process underlying the safety issue, based on the system's invariants. This will enable them to use methods that are well-founded in the precision framework evaluated and appropriate to the system observed.
In order to raise real questions about the limits reached by the methods that can be used, we highlight both the benefits and the risks of modeling, as a necessary means of understanding part of the system's reality, but which can also simultaneously limit the evolution and questioning of a worldview.
This approach will allow the system to be designed...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Simplified implementation of the approach
Bibliography
-
(1) - GUYONNET (J.F.) - - Cours de DEA. université de Technologie de Compiègne. Sécurité, fiabilité et risques industriels, notes pour la recherche et la conception, (2003).
-
(2) - GRES (S.), GUYONNET (J.F.) - Decisional Information System for Safety. - International Journal of the American Institute of Physic, (2007).
...
Also in our database
-
DAL PONT (J.P.) - Sécurité et gestion des risques, - [SE12] (2016).
Directory
Organizations – Federations – Associations (non-exhaustive list)
AFNOR – Association française de normalisation
http://www.afnor.org/
ADEME – French Environment and Energy Management Agency
http://www.ademe.fr/
CETIM – Centre technique des industries mécaniques
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!