2. Diagnostic preparation
When preparing a diagnosis, it's essential to draw up a schedule. This schedule must include the most important stages:
expression of needs and challenges ;
set up a working group (possibly using an outside resource) ;
perimeter definition ;
internal communication (diagnosis process, interviews to be scheduled) ;
preparatory meetings ;
interviews ;
summary of results ;
presentation of results to management ;
validation of an action plan ;
internal communication on the results of the diagnosis and actions undertaken.
Depending on the scope to be assessed, the time required to carry...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Diagnostic preparation
Bibliography
-
Réaliser un diagnostic pour mesurer les performances globales - [22748.0478], Fiches pratiques Piloter et animer la qualité, Techniques de l'Ingénieur.
Also in our database
-
SWIDERSKI (B.), REBERT (N.) - Développement durable : introduction - [G 8 000], base...
Regulations (non-exhaustive list)
Law no. 2001-420 of May 15, 2001 on new economic regulations (NOR: ECOX00000212) (JORF, consolidated version as of March 16, 2013).
Loi n° 2010-788 du 12 juillet 2010 portant engagement national pour l'environnement, loi dite "Grenelle 2" (NOR : DEVX0822225L) (JORF du 13 juillet 2010).
Decree 2002-221 of February 20, 2002 implementing article L. 225-102-1 of the French Commercial Code and amending...
Standards and norms
- Lignes directrices relatives à la responsabilité sociétale. - NF ISO 26000 - 2010
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!