6. Step 4: Integration and IVVQ
The demonstrator qualified at gate W1 has proven its technical feasibility within a limited scope. Step 4 transforms it into an integrated system, connected to the site’s production environment, and subjects it to a full IVVQ cycle:
integration;
verification;
validation;
qualification.
It is this phase that distinguishes the workshop prototype from the system authorized to provide responses to operators under real-world conditions.
The integration of the system into the site’s infrastructure follows a fundamental principle: cause no disruption....
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Step 4: Integration and IVVQ