9. Mould acceptance protocol
SCROLL TO TOP
9.1.1 Off-press checks
Prior to press testing, the following checks can be carried out to verify the quality of the mechanical design:
Checking the parting line by applying blue on the parting line and checking the spans after closing;
disassembly, inspection and reassembly (detection of makeshift repairs: welding and foil)
measurement of flow rates and pressure drops in cooling circuits:...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Mould acceptance protocol