4. Future of the blast furnace
Between 1965 and 1976 [2], the internal volume of the largest units commissioned rose from 2,000 to 5,000 m3 (HF2 at Oïta and HF3 at Kashima); all blast furnaces commissioned since then, with the exception of HF5 at Tcherepovetz in the USSR (5,580 m3), have an internal volume of less than 4,800 m3 (4,350 m3 on average for those over 4,000). There has therefore been an undeniable slowdown in the development of blast furnace dimensions, and this leads us to believe that further growth is unlikely; the reasons for this are less technological than cyclical and organizational (due to the lack of operating flexibility of a hypergiant blast furnace). Beyond the foreseeable future, some...