4. Cable link construction and operation
The study of an underground transmission or distribution link must first define the following points:
the most appropriate cable technology, taking into account the characteristics of the link, in particular its length, installation and operating conditions;
cable sizing, taking into account the load to be carried and its foreseeable future evolution, short-circuit current and, possibly, voltage drop problems;
the initial investment cost and subsequent operating costs, including any maintenance costs.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Cable link construction and operation
Bibliography
References
HV and HVB cables
-
(1) - SEE - La mise en œuvre du câble MT en zone rurale. - 44e journée (nov. 1984).
-
(2) - CIGRE 1980 - 21-06. Results of tests and experience in service, in France, with high voltage cables with synthetic insulation.
- ...
Thesis
-
MATALLANA (T.) - Étude des propriétés de transport et de charge d'espace d'un nouveau matériau à base de polyéthylène pour l'isolation des câbles haute tension à courant continu. - Université des sciences et techniques du Languedoc (2001).
Regulations
Inter-ministerial decree of May 26, 1978 (standard UTE C-11-001): Technical conditions to be met by electrical power distribution, modified by decrees of March 31, 1981 and April 16, 1982.
Arrêté du 2 avril 1991 fixant les conditions techniques auxquelles doivent satisfaire les distributions d'énergie électrique.
Power grids and the environment" agreement, 2001-2003
Standardization
French Standards Association (Afnor)
http://www.afnor.fr
Technical Union of Electricity (UTE)
http://www.ute-fr.com
- Méthodes d'essais. Détermination conventionnelle de la corrosivité des fumées. - NF C20-453 - 1-1985
- Méthodes d'essais. Essais climatiques...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!