5. Which projects should be selected and how should they be financed?
(See Energy Audit Methodology, Deming Wheel (Tool
1
), ACT phase).
The next step is to select the work to be carried out based on the estimated energy savings they can generate. Among the possible measures, the auditor may propose:
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Which projects should be selected and how should they be financed?
Bibliography
Energy Efficiency Approach, Lionel MUNCH - Dunod Publishing (2016).
Technical Guide to Energy Audits, Moncef KRARTI and Dominique MARCHIO - Presses des Mines (2016).
Building Renovation & Energy Performance, Brigitte VU and Pascal LAUDE - Dunod Publishing (2020).
RE2020 and energy renovation - Practical guide, SENOVA - Eyrolles Publishing (2021).
...
Normative reference
NF EN 16247-1 Energy audits Part 1 – General requirements – published in October 2012.
NF EN 16247-2 Energy audits Part 2 – Buildings – published in July 2014.
NF EN 16247-3 Energy audits Part 3 – Processes – published in July 2014.
NF EN 16247-4 Energy audits Part 4 – Transport – published in July 2014.
NF EN 16247-5 Energy audits Part 5...
Downloadable tool
Energy audit methodology, Deming wheel
1
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!