7. Action on industrial buildings
The industrial building, the envelope in which the industrial production activity takes place, has rarely been studied, since in most branches of industry, the highest energy consumption is due to the production line. Added to this is the profitability of the actions to be taken. In the industrial sector, the payback period is generally no more than 5 years, and it's not uncommon for companies to limit it to 1 year. The profitability of insulating a facade or roof, for example, rarely falls within these limits.
The ground plan must be up to date, as must the network plan (see below).
The characteristics of the buildings will be recorded in order to study their improvement, but above all the leaks, deteriorations...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Action on industrial buildings
Bibliography
-
(1) - SDES - Les chiffres clés de l'énergie - (2020 et 2021).
-
(2) - ADEME - Étude « Vision 2030-50 » sur les perspectives d'économies d'énergie - (2019).
-
(3) - ATEE - Guide sur l'État des lieux des solutions de financement et de garantie de la performance...
Also in our database
-
KECHEMAIR (D.) - Efficacité énergétique dans l'industrie. Les bénéfices pour l'entreprise. -
Standards and norms
- Document normatif français et traduit en anglais : Référentiel de bonnes pratiques du diagnostic énergétique dans l'industrie - AFNOR BP X 30 120 - 2006
- Audit énergétique : l'audit énergétique parties 1 à 5, de 2012 à 2015 - NF EN 16247 -
- Energy metering and monitoring plan – Design and implementation – Principle of energy data collection – Energy measurement and monitoring plan – Design and implementation...
Regulations
Law no. 2005-781 of July 13, 2005 on energy policy (Loi POPE)
Directive 2010/75/EU on industrial emissions (known as "IED") adopted in 2010 (recast of Directive 2008/1/EC concerning integrated pollution prevention and control, known as IPPC, from 2008)
Directive 2012/27/EU of the European Parliament and of the Council of October 25, 2012 on energy efficiency
Law no. 2013-619 on various provisions for adapting to...
Directory
Public bodies
Public body responsible for implementing the energy transition – Ademe http://www.ademe.fr
Public Investment Bank – Bpifrance http://www.bpifrance.fr
Ministry of Energy http://www.gouv.energie.fr
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!