3. Syngas purification and conditioning
Raw syngas is generally laden with a number of troublesome elements (dust, sulfur compounds, mineral acids, ammonia, etc.) which need to be removed before the gas is injected into the combustion turbine combustor (figure 4).
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Syngas purification and conditioning
Bibliography
-
GEOSITS (R.F.), MOHAMMAD-ZADEH (Y.), BLAMIRE (D.K.), GRANATSTEIN (D.L.) - Évaluation de l'intégration du CCIGC. - 240 p., Association canadienne de l'Électricité, sept. 1994.
-
RUBY (J.), PETCHTL (P.), WESTSIK (J.) - Recueil de données techniques ACE sur les cycles de production d'énergie améliorés, volume...
Manufacturers (non-exhaustive list)
The construction of an IGCC plant generally involves three manufacturers, one for each of the main islands: gasifier, combined cycle and air separation unit. Tables 1,
Operators
Table 4 shows the main operators of industrial-scale IGCC power plants in operation or under construction worldwide. This list is likely to grow in the near future, as all utilities are likely to equip themselves with IGCC plants, since this is one of the clean...