4. Mistakes to avoid
Failure to obtain GWO, SST, electrical and ATEX approvals to install a wind farm or electrolyser will result in administrative, financial and criminal penalties, following inspection by the public authorities and the inspector responsible for certifying the installation.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Mistakes to avoid
Bibliography
Also in our database
-
(1) - Produire localement de l'hydrogène décarboné (production sans fossile) -
Reference standards
NF C 15-100 relative aux règles de conception, de réalisation et d'entretien des installations électriques basse tension en France.
NF EN 16713-3 on requirements and test methods for water treatment equipment and systems.
NF EN 16401 on chemicals used for water treatment.