5. Glossary
LCOE (Levelized Cost of Energy)
The average discounted cost of energy, calculated by dividing
the sum of CAPEX and OPEX by energy production.
CAPEX (Capital Expenditures)
Refers to the initial investment, which includes the purchase
and installation of all components (PV modules, inverters, mounting
structures, wiring, land, etc.).
OPEX (Operating Expenses)
Refers to operating costs (monitoring, cleaning of modules, replacement
of defective equipment, etc.). The energy output of a photovoltaic
system takes into account day/night cycles, seasonal variations, weather
variations (e.g., cloud cover), as well as system aging.
SCROLL TO TOP
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!