9. Conclusion
In order to guarantee the certification of a new vehicle within the time allowed for its operation, manufacturers or operators must allow sufficient time in their project planning, taking into account regulatory deadlines, for the equipment conformity assessment process, before it can be put into service on the European rail network. The time required for the authorization process may differ depending on whether the equipment is of a new, complex design, or already authorized but substantially modified.
Over the next few years, rolling stock admission issues are likely to become increasingly important, in view of the development of private operators and new trans-European and even transcontinental relations.
...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
Conclusion
Bibliography
-
(1) - ALLENBACH (J.M.), CHAPAS (P.), COMTE (M.), KALLER (R.) - Traction électrique. - Presses Polytechniques et Universitaires Romandes, Lausanne (2008).
-
(2) - CEF - Centre d'essais ferroviaire de Valenciennes. - Brochure CEF (2010).
-
(3) - SIEMENS - Test...
Also in our database
-
CHAPAS (P.) - Matériel roulant ferroviaire – Architecture et conception mécanique. - [TRP 3 070]...
Websites
European register of authorized vehicle types (RETVA) https://eratv.era.europa.eu/eratv/
Einsenbahn Bundesamt (EBA) http://www.eba.bund.de
Federal Office of Transport (FOT) http://www.bav.admin.ch
Agenzia...
Standards and norms
Interoperability standards are available at http://www.era.europa.eu
• Locomotive and Passenger TSI from 1er January 2015
• STI Noise November 26, 2014
• TSI Persons with reduced mobility from 1 January 2015
• STI Wagons from 1er January 2014
The specification is available on the EPSF website...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!