7. ERTMS lines in service or under construction
In September 2006, several lines in Europe were equipped with ERTMS and are now in service:
Italy: the Rome-Naples line has been operating with ERTMS level 2 since December 2005;
Spain: the Madrid-Lérida high-speed line is equipped with ERTMS level 2 superimposed on ERTMS level 1. Level 1 has been in service since spring 2006, and is used by all high-speed trains. Level 2 will be introduced at a later date;
Switzerland: ERTMS level 2 has been in service on the Mattstetten-Rothrist line since July 2006;
in Luxembourg: ERTMS level 1 is in service on some sections;
in Germany: the Berlin-Halle-Leipzig ERTMS level 2 line operates in superposition with lateral signalling.
Many...
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed?
Log in!
Ongoing reading
ERTMS lines in service or under construction