a phase with a test train, but on a site limited in length and speed (figure 14);
a phase with the test train on a 40 km site at a maximum speed of 160 km/h, with the possibility of simulating trains running ahead of the test train;
a phase on the actual LGV site.
The test platform with its equipment, edges, floors and environmental simulators was included in the tender specifications and basic contract supplies from the outset.
You do not have access to this resource.
Exclusive to subscribers. 97% yet to be discovered!
This offer includes interactive articles. Their quizzes highlight the key information to remember and validate their acquisition: from reader to player, you can enrich your knowledge.
You can easily identify them thanks to this pictogram: