2. Steps in the AP913 process developed by INPO
2.1 Preamble
INPO does not recommend specific solutions for implementing each process in AP913. It leaves it up to operators to decide on the appropriate strategy for deploying AP913, adapted to the specific features of the nuclear power plants they operate. Apart from the USA, other countries have adopted this approach in full or in part, adapting the various criteria of this maintenance strategy for existing plants (Belgium, France, Korea) or those under construction, including the EPR™ (European Pressurized-Water Reactor ).
AP913 aims to increase equipment reliability to improve safety and availability. It describes the processes for continuous improvement of equipment and system reliability. The recommendations of AP913 include not only classic MBF methodology,...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Steps in the AP913 process developed by INPO
Article included in this offer
"Safety and risk management"
(
463 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!