Analyze risk at the workstation
Nanoparticle risk assessment using the "Banding" control method

Add to my library

FIC1642 V1 Practical sheet

Analyze risk at the workstation


Nanoparticle risk assessment using the "Banding" control method

Authors : Delphine FRANCO, Nicolas KIEFER

Publication date: October 10, 2017 | Lire en français

Add to my library Add to my library

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Analyze risk at the workstation

In steps 2 and 3, we assessed an OHB level, which characterizes the substance's level of hazard, based on current knowledge. We also defined an Exposure Index (EI), which characterizes the level of workplace exposure to the nanoparticulate substance.

As a final step, the combination of IE and OHB leads to a risk index (IR): IR = OHB - IE

Picto outil Tool
Nanoparticle workstation assessment tool using Banding control
You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Safety and risk management"

( 463 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details

Contenus associés

Sur le même sujet

Veille personnalisée : Inscrivez-vous !
Contact us