Sizing dry process furnaces
Cement kilns - Clinker firing workshops
Article REF: BE8844 V1
Sizing dry process furnaces
Cement kilns - Clinker firing workshops

Authors : Robert BASTIER, Alexandre BOCAN, Bernard GILBERT, Alain REGNAULT

Publication date: July 10, 2000 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

4. Sizing dry process furnaces

4.1 Theoretical method

The proposed calculation method is a two-stage process:

  • first, an initial assessment of the furnace diameter is made, based on the desired production (P 1 ), using the law of material transport inside a rotating, inclined tube ;

  • in a second step, reconciling the heat exchange capacity and the energy requirements for clinkerization enables a second evaluation of the kiln output (P 2 ); this evaluation is based on the diameter estimated above, taking an arbitrary kiln length of 16.4 D i , of which 12 D i ...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Ongoing reading
Sizing dry process furnaces

Article included in this offer

"Industrial thermal engineering"

( 38 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details
Contact us