6. Liability and litigation
From the outset of contract negotiations, the lessor (and more specifically the contractor, architect or consulting engineer) incurs a number of responsibilities.
These are very varied, and must be examined both during the contract performance phase (before acceptance of the work) and after acceptance of the work.
6.1 Contract performance disputes
In the performance of its contract, the lessor may incur various contractual or extra-contractual liabilities.
SCROLL TO TOPExclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Liability and litigation
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!