1. Site installation
Setting up the site installation is a very important phase in site preparation. Indeed, questions relating to the site installation are raised as soon as the tender documents are drawn up, in order to establish the constraints linked to the progress of the work.
Employers are required to provide their employees with hygiene facilities on worksites, including changing rooms, washbasins, toilets and showers, and eating areas. These facilities enable employees to ensure their personal cleanliness and well-being.
So how do you set up your site installation?
1.1 Understanding the role of site installation
The site installation is used for :
organize the construction site ;...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Site installation
Article included in this offer
"Preparing for construction"
(
117 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Standards and norms
- Private markets – Sample notebooks – Cahier des clauses administratives générales (CCAG) applicable to privately contracted building works + Amendment A1 (November 2009) - NF P03-001 - Décembre 2000
- Low-voltage electrical installations – Introduction + Update (June 2005) + Amendment A2 (November 2008) + Amendment A3 (February 2010) + Amendment A4 (May 2013) + Amendment A5 (June 2015) - NF C15-100 - Décembre 2002 ...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!