2. Equipment
2.1 Connection to the public network
To be serviced, a plot of land must be connected to the drinking water network. To do this, the owner must complete a number of formalities and pay the connection costs.
It includes :
a meter to indicate the quantity of water consumed and billed;
a look with a lid ;
a shut-off valve belonging to the company to neutralize the water supply;
a shut-off valve to isolate the meter in case of replacement;
a non-return valve to avoid injecting polluted water into the city circuit;
a pipe between the connection and the house, generally...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!
Equipment
Article included in this offer
"Finishing work and technical packages"
(
67 articles
)
Updated and enriched with articles validated by our scientific committees
A set of exclusive tools to complement the resources
Bibliography
- (1) - COMMISSION CHARGÉE DE FORMULER DES AVIS TECHNIQUES - Systèmes de canalisations sous pression à base de tubes en matériaux de synthèse : tubes en couronnes et en barres. - Cahiers du CSTB, Novembre 2011.
Standards and norms
- Building work – Sanitary plumbing for...
Exclusive to subscribers. 97% yet to be discovered!
Already subscribed? Log in!