DTU 33.1 part 1.2 CGM – General material selection criteria
Curtain walls - Definitions - Terminology - Product standards and DTU (unified technical documents)
Article REF: C3600 V1
DTU 33.1 part 1.2 CGM – General material selection criteria
Curtain walls - Definitions - Terminology - Product standards and DTU (unified technical documents)

Author : Moïse RIOTTEAU

Publication date: August 10, 2009, Review date: March 4, 2015 | Lire en français

Logo Techniques de l'Ingenieur You do not have access to this resource.
Request your free trial access! Free trial

Already subscribed?

6. DTU 33.1 part 1.2 CGM – General material selection criteria

This part of the DTU defines the products that go to make up a curtain wall. It also refers to the standards applicable to each component. See DTU 33.1 P1.2.

Here is a list of the main chapters:

  • 3 Secondary frameworks, frames, sheet metal ;

  • 3.1 Steel sections and sheet metal ;

  • 3.1.1 Hot-rolled sections ;

  • 3.1.2 Sections formed from sheet metal ;

  • 3.1.3 Steel sheet metal ;

  • 3.1.4 Surface treatment of steel sections or sheet metal ;

  • 3.2 Aluminum and aluminum alloy sections and sheet metal ;

  • 3.2.1 Extruded sections ;

  • 3.2.2 Aluminium sheet metal ;...

You do not have access to this resource.
Logo Techniques de l'Ingenieur

Exclusive to subscribers. 97% yet to be discovered!

You do not have access to this resource. Click here to request your free trial access!

Already subscribed?


Article included in this offer

"Finishing work and technical packages"

( 67 articles )

Complete knowledge base

Updated and enriched with articles validated by our scientific committees

Services

A set of exclusive tools to complement the resources

View offer details